Permit Info
Permit Info
Permit Number: M2301894
Project Name:
Location : 1735 LEWISVILLE-CLEMMONS RD
Case Type: Mechanical New Commercial
Sub Type:
Status: Complete
Date Issued: 3/27/2023 5:03:32 PM
Parent Cases: C2200620 |
Site Addresses
| Site Address | Suite/Unit # | City | State | Zip | Tax Parcel ID |
|---|---|---|---|---|---|
| 1735 LEWISVILLE-CLEMMONS RD | CL | NC | 27012 | ||
| 1735 LEWISVILLE-CLEMMONS RD | CL | 27012 |
People
| Name | Role | Company | Work Phone | Cell Phone | Comment | |
|---|---|---|---|---|---|---|
| PILOT MECHANICAL PILOT MECHANICAL | Applicant | 3363681173 | ritas@pilotmech.com | 23927 | ||
| WINSTON SALEM/FORSYTH COUNTY BOARD OF EDUCATION | Property Owner |
Contractors
| Business Name | Contractor Type | City | State |
|---|---|---|---|
| PILOT MECHANICAL | HEATING | PILOT MOUNTAIN | NC |
Permit Details
Fuel Type
| Description | Value |
|---|---|
| Fuel Type: | Electric |
Description of Work
| Description | Value |
|---|---|
| Description of Work: | • Labor and material to install one Mitsubishi Smart Multi Zone split heat pump outdoor condensing unit with five indoor wall mounted heads per plans and specs. • Labor and material to install pumps for each indoor ductless unit. • Labor and material to mount condensing unit to wall with wall bracket per plans and specs. • Labor and material to install five required refrigeration lines per plans and specs. • Labor and material to install required branch selector box per plans and specs. • Labor and material to install required condensation drainage with specified drain line insulation for five proposed systems per plans and specs. • Labor and material to install five digital / 7 day programmable wall mounted thermostats, with thermostat covers per plans and specs • Labor and material to install four exhaust fans with associated venting to wall caps per plans and specs. • Labor and material to perform system start-up and verification of correct operation per plans and specs. |
BTU (# of units)
| Description | Value |
|---|---|
| 0-150000: | — |
| over 150000: | — |
KWS (# of units)
| Description | Value |
|---|---|
| 0-45: | — |
| over 45: | — |
Air Condition Tons (# of units)
| Description | Value |
|---|---|
| 0-25: | 5.00 |
| over 25: | — |
Wall/Roof Exhaust < 10' Duct
| Description | Value |
|---|---|
| Wall / Roof Exhaust < 10' Duct: | 4.00 |
Exhaust System (CFM)
| Description | Value |
|---|---|
| 0-2000: | 4.00 |
| 2001-3000: | — |
| 3001-5000: | — |
| over 5000: | — |
Mechanical Energy
| Description | Value |
|---|---|
| GeoHP | — |
Mechanical Other
| Description | Value |
|---|---|
| Boilers: | — |
| Wall Heat Pumps: | — |
| House Connections: | — |
| Unit Heaters: | — |
| Infrared Heating Unit: | — |
| Duct Systems: | — |
| Furnace: | — |
| Gas Outlets: | — |
| Variable Air Volume: | — |
| Solar: | — |
| Fan Coil Units: | — |
| Other: | — |
Building Type
| Description | Value |
|---|---|
| Building Type: | — |
| # of units: | — |
Mechanical sqft
| Description | Value |
|---|---|
| Mechanical (sqft): | 121.00 |
Tasks
| Task Description | Result Description | Date Scheduled | Date Completed | Completed By | Comments |
|---|---|---|---|---|---|
| Issue Permit | ISSUE | 3/28/2023 | 3/27/2023 | PLL admin | View Comments |
| Mechanical Rough-In | FAILED | 3/31/2023 | 3/31/2023 | TROY ALLGOOD | View Comments |
| Mechanical Rough-In | FAILED | 4/6/2023 | 4/10/2023 | TROY ALLGOOD | View Comments |
| Mechanical Rough-In | PASSED | 4/10/2023 | TROY ALLGOOD | View Comments | |
| Final Mechanical Inspection | PASSCOMP | 8/14/2023 | 8/14/2023 | TROY ALLGOOD | View Comments |
Inspection Requests
| Inspection Type | Inspection Date | Requested By | Status |
|---|---|---|---|
| Mechanical Rough-In | 3/30/2023 | Pilot Mechanical - Steve | Completed |
| Final Mechanical Inspection | 8/11/2023 | Pilot Mechanical - Jon | Completed |
| Mechanical Rough-In | 4/5/2023 | Pilot Mechanical | Completed |
Conditions
| Condition Description | Date Applied | Date Completed |
|---|
Flags
| Flag Description | Date Applied | Date Completed |
|---|
Notes
| Note |
|---|
Fees
| Fee Description | Fee Amount | Balance Due | Date Created |
|---|---|---|---|
| HVAC Exhaust Systems | $365.00 | $0.00 | 3/27/2023 4:59:08 PM |
| HVAC Gas Outlets | $0.00 | $0.00 | 3/27/2023 4:59:08 PM |
| HVAC Heat Pumps, AC Commercial | $125.00 | $0.00 | 3/27/2023 4:59:08 PM |
| Commercial HVAC Heat Producing Equipment | $0.00 | $0.00 | 3/27/2023 4:59:08 PM |
| Minimum Trade | $0.00 | $0.00 | 3/27/2023 4:59:09 PM |
| Mechanical Extra Trip Charge | $40.00 | $0.00 | 4/10/2023 7:26:45 AM |
Payments
| Fee Description | Fee Amount | Payment Amount | Payment Date | Payment Method | Reference |
|---|---|---|---|---|---|
| HVAC Exhaust Systems | $365.00 | $365.00 | 3/27/2023 | Credit Card | 959013047 |
| HVAC Heat Pumps, AC Commercial | $125.00 | $125.00 | 3/27/2023 | Credit Card | 959013047 |
| Mechanical Extra Trip Charge | $40.00 | $40.00 | 8/11/2023 | Credit Card | 1093104269 |
Attachments
| Image | Name | Date Created |
|---|